This sub-project, within the “Future-project” aims to investigate and install a pilot plant for balancing energy flows with a suitable distribution for two buildings within the SUS Malmö hospital area, named buildings 46 and 96. Balancing is done by connecting rooms with cooling needs via heat pump and transferring excess heat to systems with heating needs.
Region Skåne
Regionfastigheter
David Nilsson
David.p.Nilsson@skane.se
EON
EON Energilösningar AB
Ellen Corke
ellen.corke@eon.se
Publicerad av
FUTURE
Layout
Kasper Laulund Kjeldsmark (Gate 21)
Malmö sjukhusområde
Fotograf: Perry Nordeng
2021
FUTURE: Slutrapport Case 3
FUTURE: Slutrapport Case 3
This sub-project, within the “Future-project” aims to investigate and install a pilot plant for balancing energy flows with a suitable distribution for two buildings within the SUS Malmö hospital area, named buildings 46 and 96. Balancing is done by connecting rooms with cooling needs via heat pump and transferring excess heat to systems with heating needs.
Detaljer om udgivelsen
Region Skåne
Regionfastigheter
David Nilsson
David.p.Nilsson@skane.se
EON
EON Energilösningar AB
Ellen Corke
ellen.corke@eon.se
Publicerad av
FUTURE
Layout
Kasper Laulund Kjeldsmark (Gate 21)
Malmö sjukhusområde
Fotograf: Perry Nordeng
2021